BMS Project Engineer – London - £70,000
gtbmsprojectmanldn

£50,000 - £70,000 Per Annum

Full Time

Permanent

Central London, Greater London

Engineering And Technical

Posted 25 days ago

Expires In 3 Days

Job Description

BMS Project Engineer – London - £70,000


We are representing a nationwide BMS company who provide wide range of services across the UK, Due tosheer growth they are seeking a BMS Project Engineer.


Salary Package:
  • £50,000 - £70,000
  • Company Vehicle 
  • Training & Development
  • 25 days holidays & 8 bank 
  • Healthcare
  • Laptop & Phone
  • Qualifications
 
Duties:

  • Carrying out commissioning
  • Carrying out small works
  • Carrying out O&M Manuals
  • Providing handovers
  • Ensuring health and safety standards are met
  • Client meetings
  • Weekly reports
  • Working alongside PM & Sales team
  • Managing costs
Please Contact
Georgie Thain
gthain@rgb.co.uk
020 7932 2800

Georgia Thain

gthain@rgb.co.uk

02079 322800

Division 697

RGB Network

Lincoln House (LG01)

1 - 3 Brixton Road

London

Greater London

SW9 6DE

0207 932 2800

View Branch Details
Jobs With RGB Network

Recommended Jobs

£35,000 - £48,000 Per Annum

Central London, Greater London

Contract

Posted 24 days ago

Ref ZSFSWE443

View Details

£30,000 - £44,000 Per Annum

Central London, Greater London

Permanent

Posted 25 days ago

Ref gtfsmallworksldnf

View Details

£50,000 - £70,000 Per Annum

Central London, Greater London

Contract

Posted 25 days ago

Ref ZSBMSPEL701

View Details