Find a Job
Pertemps
£13.50 - £17 Per Hour
Full Time, Temporary
Wednesbury, West Midlands
Ref 037107961
Posted 3 days ago
Riverside Recruitment
£27,000 - £34,000 Per Annum
Full Time, Permanent
Carlisle, Cumbria
Ref 112144651
Posted 3 days ago
Pertemps
£18 Per Hour
Full Time, Temporary
Redditch, Hereford and Worcester
Ref 252108841
Posted 19 days ago
Pertemps
£26,227 - £30,000 Per Annum
Full Time, Permanent
Totton, Hampshire
Ref 365206451
Posted 17 days ago
Pertemps
£35,000 - £40,000 Per Annum
Full Time, Permanent
Netherton, West Midlands
Ref 046109767
Posted 24 days ago
Pertemps
£12.71 - £13.40 Per Hour
Full Time, Temporary
Motherwell, North Lanarkshire
Ref 629106738
Posted 7 hours ago
Pertemps
£12.71 Per Hour
Full Time, Temporary
Wrexham, Wrexham
Ref 128106698
Posted 18 days ago
Pertemps
£27,000 - £28,000 Per Annum
Full Time, Permanent
Hereford and Worcester, Hereford and Worcester
Ref 038109478
Posted 21 days ago
Pertemps
£27,000 - £28,000 Per Annum
Full Time, Permanent
Hereford, Hereford and Worcester
Ref 038109484
Posted 13 days ago
Pertemps
£34,500 Per Annum
Full Time, Permanent
Newport, Newport
Ref 009202893
Posted 28 days ago
Frequently Asked Questions:
How many Planning Officer (Manufacturing) jobs are available on Pertemps?
There are 1371 Planning Officer (Manufacturing) jobs available on Pertemps right now.
What does a Planning Officer (Manufacturing) do?
Planning engineers decide and develop the most appropriate economic models and engineering methods for projects. They work in a variety of fields such as civil engineering or construction. Planning engineers are normally onsite during an engineering project to supervise all stages of work and provide solutions.
Tasks required include:
- Devises inspection, testing and evaluation methods for bought-in materials, components, semi-finished and finished products.
- Ensures accuracy of machines, jigs, fixtures, gauges and other manufacturing and testing equipment.
- Prepares work flow charts for individual departments and compiles detailed instructions on processes, work methods and quality and safety standards for workers.
- Analyses plans, drawings, specifications and safety, quality, accuracy, reliability and contractual requirements.
- Prepares plan of sequence of operations and completion dates for each phase of production or processing.
- Oversees effective implementation of adopted processes, schedules and procedures.
What are the entry requirements for a Planning Officer (Manufacturing)?
Quality control and planning engineers usually possess an accredited university degree. After qualifying, periods of appropriate training and experience are required before membership of a chartered engineering institution is achieved. Incorporated engineers possess an accredited university degree, BTEC/SQA award or an apprenticeship leading to an NVQ/SVQ at Level 4. All routes are followed by periods of appropriate training and relevant experience.