Find a Job
Pertemps | Royal Mail
£13.69 Per Hour
Full Time, Temporary
Dursley, Gloucestershire
Ref 148101095
Posted 20 days ago
Pertemps | Royal Mail
£13.69 Per Hour
Full Time, Temporary
Witney, Oxfordshire
Ref 148101151
Posted 5 days ago
RGB Recruitment
£30,000 - £40,000 Per Annum
Full Time, Permanent
Bristol, Bristol
Ref 106179
Posted 5 days ago
Pertemps | Royal Mail
£13.69 Per Hour
Full Time, Temporary
Wilmslow, Cheshire
Ref 148101173
Posted 3 days ago
Pertemps | Parcel Force
£15.06 Per Hour
Full Time, Temporary
Carlisle, Cumbria
Ref 148101100
Posted 6 days ago
Pertemps | Royal Mail
£13.69 Per Hour
Full Time, Temporary
Kidderminster, Hereford and Worcester
Ref 148101144
Posted 5 days ago
Pertemps | Royal Mail
£13.69 Per Hour
Full Time, Temporary
Tewkesbury, Gloucestershire
Ref 148101126
Posted 7 days ago
Pertemps | Royal Mail
£13.69 Per Hour
Full Time, Temporary
Oakengates, Shropshire
Ref 148101132
Posted 6 days ago
Pertemps | Royal Mail
£13.69 Per Hour
Full Time, Temporary
Bristol, Bristol
Ref 148101136
Posted 1 day ago
Pertemps
£40,000 - £50,000 Per Annum
Full Time, Temporary
Daventry, Northamptonshire
Ref 114101052
Posted 13 days ago
Frequently Asked Questions:
How many Planning Officer (Manufacturing) jobs are available on Pertemps?
There are 1371 Planning Officer (Manufacturing) jobs available on Pertemps right now.
What does a Planning Officer (Manufacturing) do?
Planning engineers decide and develop the most appropriate economic models and engineering methods for projects. They work in a variety of fields such as civil engineering or construction. Planning engineers are normally onsite during an engineering project to supervise all stages of work and provide solutions.
Tasks required include:
- Devises inspection, testing and evaluation methods for bought-in materials, components, semi-finished and finished products.
- Ensures accuracy of machines, jigs, fixtures, gauges and other manufacturing and testing equipment.
- Prepares work flow charts for individual departments and compiles detailed instructions on processes, work methods and quality and safety standards for workers.
- Analyses plans, drawings, specifications and safety, quality, accuracy, reliability and contractual requirements.
- Prepares plan of sequence of operations and completion dates for each phase of production or processing.
- Oversees effective implementation of adopted processes, schedules and procedures.
What are the entry requirements for a Planning Officer (Manufacturing)?
Quality control and planning engineers usually possess an accredited university degree. After qualifying, periods of appropriate training and experience are required before membership of a chartered engineering institution is achieved. Incorporated engineers possess an accredited university degree, BTEC/SQA award or an apprenticeship leading to an NVQ/SVQ at Level 4. All routes are followed by periods of appropriate training and relevant experience.